英语造句
位置:首页>> 英语造句>>critical path造句,critical path例句

critical path造句

1、What about dependencies and critical path analysis?
依赖和关键路径分析如何去做?

2、Critical path is useful in regression testing and other severely time-constrained testing.
关键路径在回归测试和其它有严格时间控制的测试中十分有用。

3、161 on our most projects critical path method(cpm) is used for scheduling.
在我们的大多数工程项目中都采用“统筹法”(即关键路线方法,简称cpm)安排计划。

4、DETERMINING OF CRITICAL PATH IN PERT NETWORK PROGRAM WITH FUZZY PROBABILITY
用模糊概率确定PERT网络计划的关键路线

5、This method of analysis is commonly known as the Critical Path method.
该分析方法通常被称为关键路线法(Critical Path Method (CPM))。

6、161 On our most projects Critical Path Method (CPM) is used for scheduling.
下个月我们将召开设计数据收集(初步设计、最终设计)会议。

7、Hardware architecture and critical path analysis are also introduced.
给出了硬件结构图及关键路径分析。

8、S method, which was created by Kato Shokichi, the event on the critical path should be done first.
通常流行的日本加藤昭吉的K·S法,主张关键工序先进行。

9、Show the critical path for your project to quickly find problem tasks.
显示项目的关键路径:以快速查找有问题的任务。

critical path翻译

【计】 关键路径【经】 关键路线 详情
0
纠错
手机版 critical path造句 单词乎 www.dancihu.com